Please accept this reference as a true evaluation of our experience of working with Fix Set Ireland Ltd.
Fix Set Ireland Ltd. has worked with SIAC on several projects over the past 5 years. During this time, we have found Fix Set, its principles and its operatives to be capable, diligent and cooperative.
Fix Set Ireland Ltd. has been awarded the Reinforced Concrete Structures works on numerous SIAC projects. That we have used Fix Set Ireland Ltd. with such regularity may be taken as an indication of our satisfaction with their overall performance.

Our specific performance marker evaluations are as follows:

1 Health & Safety Performance Very Good
2 Quality / Workmanship Excellent
3 Resources / Availability Excellent
4 Cost / Efficiency Very Good
5 Experience & Knowledge Excellent
6 Flexibility / Cooperation Excellent

The following is a list of projects on which Fix Set Ireland Ltd. were contracted to SIAC Construction Ltd.

2009-2010 Dromada 110kV Electrical Substation (Design & Build)
2009 Curragh Mountain Wind Farm (Design & Build)
2008 Kanturk Recycling Centre
2007-2008 Knockastanna Wind Farm (Design & Build)
2007-2008 Lispole Bridge Deck Replacement and Widening
2007 Tournafulla Wind Farm Phase II (Design & Build)
2006 Tournafulla Wind Farm Phase I (Design & Build)

I would be pleased to confirm this reference should you wish to contact me

Owen Joy, Contracts Manager